Monday 25 to Sunday 31 March 2024
Monday 25 to Wednesday 27 March
There are no planned changes to our timetable.
Thursday 28 March – Maundy Thursday
The stops at York, Darlington and Newcastle on the following services will be for customers to board only. Customers travelling to these stations should use alternative services.
- 10.00 from London King’s Cross to Aberdeen
- 12.00 from London King’s Cross to Inverness
- 14.00 from London King’s Cross to Aberdeen
Friday 29 March – Good Friday
The stops at York, Darlington and Newcastle on the following services will be for customers to board only. Customers travelling to these stations should use alternative services.
- 10.00 from London King’s Cross to Aberdeen
- 12.00 from London King’s Cross to Inverness
- 14.00 from London King’s Cross to Aberdeen
- The 07.52, 09.52 and 14.52 from Aberdeen to London King’s Cross will depart stations between Aberdeen and Dundee slightly earlier than usual.
- The 15.30 from London King’s Cross to Glasgow Central will terminate at Edinburgh Waverley. A rail replacement coach service will run from Edinburgh to Motherwell. Customers travelling to Glasgow should use other operators’ services between Edinburgh and Glasgow Queen Street.
- The 19.45 from Leeds to London King’s Cross will be cancelled.
Saturday 30 March
Engineering work will take place throughout the day between Edinburgh and Glasgow.
- The 06.48 from Glasgow Central to London King’s Cross will start from Edinburgh Waverley.
- Rail replacement coaches will run between Motherwell and Edinburgh. Passengers travelling from Glasgow should use other operators’ services between Glasgow Queen Street and Edinburgh Waverley.
Engineering work will take place throughout the day between Doncaster and Leeds.
- LNER will run an hourly service each way between London King’s Cross and Leeds.
- Trains will travel on a diversionary route between Doncaster and Leeds and will be unable to call at Wakefield Westgate.
- Rail replacement coaches will operate, in both directions, between Doncaster and Wakefield Westgate.
The following services will depart stations between Aberdeen and Dundee slightly earlier than normal. The services will be back to their usual times from Dundee onwards.
- 07.52 from Aberdeen to London King’s Cross.
- 14.52 from Aberdeen to London King’s Cross.
LNER Timetable Saturday 30 March 2024
Sunday 31 March - Easter Sunday
Engineering work will take place throughout the day between Edinburgh and Glasgow.
- The 16.30 from London King’s Cross to Glasgow Central will be terminate at Edinburgh Waverley.
- Rail replacement coaches will run between Edinburgh and Motherwell. Passengers travelling to Glasgow should use other operators’ services between Edinburgh Waverley and Glasgow Queen Street.
Engineering work will take place throughout the day between Doncaster and Leeds.
- LNER will run an hourly service each way between London King’s Cross and Leeds.
- Trains will travel on a diversionary route between Doncaster and Leeds and will be unable to call at Wakefield Westgate.
- Rail replacement coaches will operate, in both directions, between Doncaster and Wakefield Westgate.