Monday 15 to Sunday 21 April
Monday 15 April
Engineering work will take place on Monday morning between Edinburgh and Glasgow.
- The 06.48 from Glasgow Central to London King’s Cross will start from Edinburgh Waverley.
- A replacement coach service will run between Motherwell and Edinburgh. Passengers travelling from Glasgow should use ScotRail services between Glasgow Queen Street and Edinburgh Waverley.
Tuesday 16 to Friday 19 April
There are no planned changes to our timetable.
Saturday 20 April
Engineering work will take place throughout the day between Doncaster and Hull.
- The 07.00 from Hull to London King’s Cross will start from Doncaster.
- The 17.18 from London King's Cross to Hull will terminate at Doncaster.
- Rail replacement coaches will run, in both directions, between Hull, Brough, Selby and Doncaster.
Sunday 21 April
Engineering work will take place throughout the day between Doncaster and Hull.
- The 17.22 from London King’s Cross to Hull will terminate at Doncaster.
- Rail replacement coaches will run between Doncaster, Selby, Brough and Hull.
Engineering work will take place throughout the day between Edinburgh and Glasgow.
- The 16.30 from London King’s Cross to Glasgow Central will terminate at Edinburgh Waverley.
- Rail replacement coaches will run between Edinburgh and Motherwell.
- Passengers travelling to Glasgow should use ScotRail services between Edinburgh Waverley and Glasgow Queen Street.